Council has published a concept plan to support a proposed upgrade to Lurline Street between Waratah Street and Echo Point (Katoomba) on its ‘Have Your Say website’ for public review and feedback. The concept plan proposes a separate cycle path within the road reserve but then indicates it will be omitted from stage one of the project delivery and suggests it can be retrofitted to stage one during later stages of the project delivery. Stage one of the project involves grant funding to beautify and improve pedestrian and cycling access on Lurline Street (between Waratah and Merriwa Streets). Ride Blue Mountains has prepared a public submission on behalf of its members objecting to the deferral of the separate cycle path because, amongst other reasons, it risks setting up a conflict, which presently does not exist, between on-road cyclists and motorists.
Key Recommendations (high level)
- Ride Blue Mountains Inc is generally supportive of plans to beautify Lurline Street in Katoomba and welcomes the opportunity to contribute to the public discussion on aspects of the proposal as set out in the Lurline Street concept plan made available on the ‘Have your Say website’.
- Ride Blue Mountains supports a BMCC proposal to construct dedicated one way cycle paths on both sides of Lurline Street but disagrees with Council’s proposal to not proceed with the construction of the separate cycle path in the first stage of the project
- Ride Blue urges Council to indicate to the community its timeframe for completing the whole 1.6km street upgrade in the context of Council’s strategic planning frameworks including and delivery and operational programs.
Background
The Blue Mountains City Council has completed a concept plan for upgrading 1.6km of Lurline Street Katoomba (between Waratah Street and Foster Street, near Echo Point) to create a treelined street, move services underground, upgrade safety crossings, upgrade pedestrian areas, include a cycle path and provide for street furniture. Only Stage One of the project is funded, being the section between Waratah and Merriwa Streets. Council proposes that the first stage will include a 4.2m shared path on both sides of the street (Diagram A). About 1.5m of this space will later be turned into a dedicated one-way cycle path (Diagram B). The effect of this will be that the 1.5m cycle path on the western side of Lurline Street will run in the direction, south to north; and the east side will run in the direction, north to south) directions for both sides of the street) when the whole section is upgraded. The concept plan indicates that the next steps of the project are to complete the detailed design and construction of stage one.
Diagram A: The Lurline Street Concept plan indicates a shared path on both sides of the street

Diagram B: Council’s Options Analysis paper (referred to below) shows the separate one-way cycleway on both sides of the street

Transport planningÂ
The strategic purpose or connectivity of the cycle path is not made clear from the concept plan on the ‘Have Your Say website’, and this makes it difficult to appreciate the public value of the proposal on the face of the concept plan. This may reflect the fact that substantial basis for the successful Bushfire Local Economic Recovery grant application is to beautify Lurline Street by rerouting services underground and planting shade trees along the street. Notwithstanding this, it is noted that Council captured a cycling and walking connection between Echo Point and the Katoomba Town Centre on Lurline Street in its Bike Plan 2020 (published in 2015). This indicates that such a connection has been considered as part of Council’s longer term active travel / transport planning to be of public value and it is therefore appropriate that it be included in the concept design for the Lurline Street upgrade.
Council’s Options Analysis for a cycle connection on Lurline Street
In August 2023, Ride Blue Mountains was invited by Council to comment on an options analysis prepared by consultants engaged by Council. The analysis looked at route options for locating a cycle path connecting the town centre and Echo Point. The options analysis established the following facts:
- Lurline Street offered the best gradient option, with an average of no more than 5% in the steepest section over a distance of 187m. Other options, including Katoomba (more than 10% gradient over 294m) and Ada and Martin Streets (around 11% for 208m) were comparatively much steeper routes.
- Strava heat maps indicated that usage of both Lurline and Katoomba Streets for cycling were about the same and formed part of an access route to Echo Point/ Cliff Drive and Leura to the east via Merriwa Street and the Cascades.Â
- The data also showed cyclist preference to use less hilly routes such as Megalong>Lett>Lyne compared with the steeper Lovel St route between Katoomba and Leura and the lower use of the steep section of Katoomba Street immediately south of the CBD.
- There is a substantial amount of motor traffic using Lurline Street to access Echo Point, particularly buses and the intersection at Waratah Street was one of the busiest in Katoomba with more than 2000 vehicle movements per day.
The analysis supported a finding that Lurline Street was the best option for a north south connection between Katoomba CBD and Echo Point because the gradient is at least half of the alternative options and it also offers better connection opportunities to Leura, Echo Point and Cliff Drive. The traffic volumes, including the high volume of buses, is offset by having a one way separate 1.5m cycle path on each side of the street which is set back from the traffic lane and protected by a barrier of trees and on street parallel parking bays (see Diagram B). The options paper recommended the cycle path also be separated from a dedicated 2.4m pedestrian path on the west side of the road and 2.1m on the east (RSL) side of the road. The options paper noted that 1.5M for a one-way separated cycle path was not ideal (a 3m path is recommended even for a one-way cycle path) however, it is absolute bare minimum under Austroads Guidelines and maybe acceptable in constrained locations.
Ride Blue Mountains Recommendations on the Lurline Street concept plan
Ride Blue Mountains does supports the findings of the Options Analysis understands the constraints which gives rise to Council’s preference for a 1.5M width cycle path, however, Ride Blue Mountains does not support the omission of this separate cycle path in the initial stage of the delivery of the Lurline Street project. Ride Blue Mountains recommends the separate cycle path be constructed at stage one and extended as the other stages of the connection to Echo Point are completed. The reasons for this recommendation are as follows:
- Council’s options paper recommends a separate cycle path because:Â
- The high volumes of pedestrian traffic on Lurline Street and the fact cyclists will travel faster on the descent and high risk of conflict/ crashes involving pedestrians and cyclists
- Lurline Street is considered a main road with traffic volumes, exceeding 2000 vehicles per day and in that case best practice guidelines (TfNSW Cycleway Design Toolbox) recommends separation from motor traffic is preferred (under the guidelines)
- The transition or travel lines from on road traffic lanes into the cycle lane can be made clearerÂ
- Experienced road cyclists are less likely to use the shared path and pedestrians are unlikely to welcome such cyclists on the shared path, given that road cyclists prefer speed and flow. Conversely, the separate cycle path is more likely to be used by cyclists of all abilities
- The proposal for a shared path on both sides of the street means that there is no distinction between cycling in a north /south direction and users will undoubtedly use both sides of the street for travelling on both directions. This puts further pressure on the pedestrian zone.
- it is not clear why Council would incur further expense by excavating a newly constructed shared path to construct a separate cycle path and new curb and gutter at a later stage of the project
- There is a significant likelihood that unless the separate cycleway is constructed from the start of the delivery, ie. at stage one, it will never be constructed and any future extensions along Lurline Street to towards Echo Point will retain the shared path concept
- If the construction of the shared path and off street parking bays and tree plantings reduces the exiting shoulders and traffic lanes, conflict will be created between on-road cyclists and motor traffic (noting on road cyclists are unlikely to transition to a shared path, especially for a few hundred metres of travel). This carries a risk that the section may become a choke point if buses and other traffic are required to sit behind on road cyclists on the ascent. Any further extension of the shared path and treelined corridor/ parking bays at the expense of existing shoulder width/ traffic lanes will add to the risk
- Council need to find a way to transition on-road cyclists into and out of the separate cycleway safely and seamlessly for it to be workable
- A separated cycleway demonstrates Council’s commitment to providing active transport for cycling and deferring the cycle path sends a signal that Council is not committed to a separate cycle pathÂ
- A separated cycleway would add to the uniqueness of Lurline St, given that it would be first separated cycleway in the Blue Mountains and defer its construction is a missed opportunity
- Detailed design for the separate cycleway must consider a safe distance between parked cars and the active cycle way to avoid car dooring from the passenger side.
Clearer Connections to Katoomba Railway Station/ Old Bathurst Road and North Katoomba
Ride Blue Mountains notes that Council has West Invest funding for cycling connections between Kiah Lookout (near Leura Cascades) and Echo Point and also to support safer cycling on Cliff Drive between Acacia Street and Narrow Neck. Consideration should also be given as to how the cycle route on Lurline Street will safely connect to Katoomba Railway Station /Old Bathurst Road to support users coming to Katoomba by train to either walk or ride to Echo Point or other visitor destinations and to link North Katoomba with destinations on the southern escarpment. Further clarity is required on Council’s timeframe for delivering the full Lurline Street upgrade and connections to other destinations such as Kiah Lookout, Cliff Drive and the Railway Station.